MIL-DTL-24677B
6.3 Consideration of data requirements. The following data requirements should be considered when this
specification is applied on a contract. The applicable Data Item Description (DID's) should be reviewed in
conjunction with the specific acquisition to ensure that only essential data are requested/provided and that the
DID's are tailored to reflect the requirements of the specific acquisition. To ensure correct contractual application
of the data requirements, a Contract Data Requirements List (DD Form 1423) must be prepared to obtain the data,
except where DoD FAR Supplement 27.475-1 exempts the requirement for a DD Form 1423.
Reference Paragraph
DID Number
DID Title
Suggested Tailoring
3.4.1, 3.10.1.3, 4.3.1,
DI - MISC - 80678
Certification / data
10.3.1 applies
and appendix
report
3.4.1 and 4.3
DI - T- 2072
Reports, Test
------
The above DID's were those cleared as of the date of this specification. The current issue of DoD 5010.12-L,
Acquisition Management Systems and Data Requirements Control List (AMSDL), must be researched to ensure
that only current, cleared DID's are cited on the DD Form 1423.
6.4 First article. When first article inspection is required, the items should be a first article sample. The first
article should consist of one unit. The contracting officer should include specific instructions in acquisition
documents regarding arrangements for examinations, approval of first article test results and disposition of first
articles. Invitations for bids should provide that the Government reserves the right to waive the requirement for
samples for first article inspection to those bidders offering a product which has been previously acquired or tested
by the government, and that bidders offering such products, who wish to rely on such production or test, must
furnish evidence with the bid that prior Government approval is presently appropriate for the pending contract.
6.5 Adjustment for high moisture content. Material furnished containing an excess of moisture will be
accepted by an adjustment in weight to the 5 percent moisture basis.
6.6
Subject term (key word) listing.
Braid
Fiber
Pick count
Put up
Splices
Yarns
Custodians:
Preparing Activity:
Army - GL
DLA - IS
Navy - SH
Air Force - 99
(Project Number 4020-0403)
Review Activities:
Navy - AS
Air Force - 82
12
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business